Eugene-Springfield Waste Water Headworks Expansion | Eugene , Oregon

$21.4 million – CM/GC

Metropolitan Waste Water Management Commission | Wildish Building Co.

This new headworks facility and influent pumping station required thorough coordination with the owner in order to maintain operations during construction. The project included two new climbing bar screens; Cutthroat flumes, grit removal units and grit pumps; 40’x40’x20’ pre-constructed concrete caisson “sunk” to final elevation; relining 800 linear feet of submerged 45” sewer force main; overhaul and replacement of variable frequency drives and pumps; and 10 precast vaults.