EWEB Turbine Shutoff Valve Installation | Eugene , Oregon

$1.7 million - CM/GC - 2018

Eugene Water & Electric Board | Wildish Building Co.

This project included the complete removal of (2) existing turbine shutoff valves within the EWEB Hydroelectric Powerhouse Facility. Once the existing TSV's were removed, the installation of (2) new 108" diameter TSV's, water operators, control piping, wiring, supports, electrical starters, drain piping, emergency cooling water piping, oil collection tank, spiral case vent piping, bypass piping and tunnel underdrain piping were performed.