Hayden Bridge Water Filtration Plant | Eugene , Oregon

$10.2M – Competitive Bid

City of Eugene | Wildish Building Co.

This project included a 2 million gallon concrete basin with a mechanical mixer, a concrete baffle wall, and a concrete channel interconnecting existing basins. It also included raw water supply pipe manifold modifications including flow metering, electric motor operated valves, and a chemical injection vault.